LOGIN  |  RSS  |  TÜRKÇE

INVESTMENTS   IN OPERATION

AGE Enerji Yatirimlarimiz

 

AGE Denizli Natural Gas Combined Cycle Power Plant

Yamaç HEPP

 

Yamaç HEPP is located within the Sumbas district of Osmaniye province. The plant is positioned at downstream of Kesiksuyu (Mehmetli) Dam which was constructed on 1965 ? 1971 and has been in operation for 38 years.

5,35 MW rated power is obtained by 12,70 m3/sec discharge with 151 m net head. Energy production capacity of Yamaç HEPP is 17 GWh/year.

 

Pınar Weir & HEPP

Pınar HEPP is located on Göksu River, within the Tut district of Adıyaman province.  30 MW rated power is obtained by 50 m3/sec discharge with 67,49 m net head.  Energy production capacity of Pınar HEPP is 137 GWh/year.

Sarmaşık II Weir & HEPP

Sarmaşık II Regulator and HEPP is located on the Maki River which is close to the Hayrat distinct of Trabzon province, after Sarmaşık I HEPP tail water. 22 MW power is obtained by 5,5 m3/sec discharge with 452,39 m net head.  Energy production capacity of Sarmaşık I HEPP is 105 GWh/year.

In this project, first time in Turkey, the power tunnel which has a 499 m approach length and % 13, % 10,5 and %2  slope, has been completed in 16 months which is a considerable short duration for such a construction. Consulting services have been provided from local and international market for the construction work.

The construction of Sarmaşık II HEPP was commenced on 2006 and the plant was commissioned on 2008.

Sarmaşık I Weir & HEPP

Sarmaşık I Wier and HEPP, is located on the Maki River which is close to the Hayrat district of Trabzon province. 21 MW rated power is obtained by 5 m3/sec discharge with 482.25 m net head.  Energy production capacity of Sarmaşık I HEPP is 95 GWh/year.

The construction of Sarmaşık I HEPP was commenced on 2006 and the plant was commissioned on 2008.

Fethiye HEPP

The plant has been put into operation in 1999 with the built-operate-transfer model. The plant is fed from the Eşen Regulator and 15.6 MW power is obtained by 12 m3/sec discharge with 154 m net head. Energy production capacity of FETHIYE HEPP is 90 GWh/year.

SITE SEARCH
All rights reserved © 2010 AGE ENERJİ Tahran Caddesi No:19 06700 Kavaklıdere/ANKARA
Tel : (0 312) 312 468 82 40 Fax : (0 312) 468 82 49